1. 尊龙凯时(中国)人生就是搏!

    Share new trends in technology and health
    Share new trends in technology and health

    Ruyuan Yangzhiguang Aluminum Products Co., Ltd. 10,000 tons/year comprehensive utilization of aluminum ash slag slag project environmental impact assessment public participation announced for the firs

    知乎 头条

    2021-07-14

    1. Name and overview of the construction project

    Project name: Ruyuan Yangzhiguang Aluminum Products Co., Ltd. 10,000 tons/year aluminum ash slag comprehensive utilization project

    Project Overview: Ruyuan Yangzhiguang Aluminum Products Co., Ltd. was established in 2011 and is located in HEC High-tech Industrial Park, Rucheng Development Zone, Ruyuan County. The company's waste aluminum comprehensive utilization production line has obtained the approval of the former Shaoguan City Ruyuan Yao Autonomous County Environmental Protection Bureau in 2011, the approval number is Ruhuanhan [2011] No. 117. It has passed the acceptance of the Environmental Protection Bureau in 2013, and the acceptance document is No. Ruhuan Shen [2013] No. 3, the production line has stopped production.

    With the shortage of bauxite resources in my country, the decline in taste, the increasing difficulty of mining, and the increasing pressure on environmental protection year by year, the issue of resource security has become one of the core issues of my country's aluminum industry strategy, which will pose a great threat to the safety of the aluminum industry.  Combining with market needs, Ruyuan Yangzhiguang Aluminum Products Co., Ltd. independently researches and develops comprehensive resource utilization technology, and plans to invest 10 million yuan to build a 10,000-ton/year aluminum ash slag comprehensive utilization project in the current factory area. The generated waste aluminum ash slag is used as the raw material, and the "ball milling-deammonia-briquetting" process is adopted to produce 10,000 tons/year of deoxidizer, 2,000 tons/year of aluminum pellets and 200 tons/year of ammonia water products. The project will not add new structures, purchase new production equipment, add 10 new workers, work 300 days a year, and work 8 hours a day. It is expected to be completed and put into production in December 2022.

    2. Name and contact information of the construction company

    Company: Ruyuan Yangzhiguang Aluminum Products Co., Ltd.
    Address: Ruyuan HEC High-tech Industrial Park Ruyuan Yangzhiguang Aluminum Products Co., Ltd.
    Contact: Manager Zhang
    Tel: 0751-5282092

    3. The name of the company that prepares the environmental impact assessment report

    Company: Guangdong Shaoke Environmental Protection Technology Co., Ltd.

    Address: 101, Building 51, Huangshaping Innovation Park , Phase I, Guanshaocheng, Wujiang District, Shaoguan City
    Postcode: 512000

    Contact: Mr Kuang
    Tel: 0751-8700090

    4. Internet link to the public opinion form

    Public Opinion Form for Environmental Impact Assessment of Aluminum Ash Slag Comprehensive Utilization Project.doc

    5. Ways and Channels for Submitting the Public Comment Form

    During the period of this announcement, if the public has any questions or suggestions on the environmental impact of the construction project in terms of atmosphere, water, noise and other aspects, or has any suggestions on the environmental protection measures of the project, please contact the construction company by visit, calls, letters, etc. The construction company will seriously verify the reported situation, and the opinions or suggestions that are true in the investigation will be adopted and run through the entire construction process.

    In the process of compiling the draft of the environmental impact report of this project, the public can put forward their opinions related to the environmental impact assessment to the construction company.

    Ruyuan Yangzhiguang Aluminum Products Co., Ltd.

    July 14, 2021

    • File size: 23KB

    Related news

    友情链接: